Contact Vertiv Ups with the facts you already have
A load list, single-line diagram or even a marked-up equipment schedule gives our team a useful starting point.

Reach the advisory desk
Address
Critical Power Advisory Center
1050 Meridian Parkway, Columbus, OH 43228
Email
[email protected]
Phone
+1 614 555 0184
Business hours
Monday–Friday, 08:00–17:00 Eastern Time
Social
Engineering Notes · Selection Updates
For urgent operating incidents, use the service contact stated in the installed system’s support agreement. This inquiry channel does not replace site emergency procedures.
Before you call
Note whether the request concerns a new design, replacement planning, capacity expansion or maintenance. For an installed system, include the product family, available serial reference, current operating mode, active alarm text and the time the condition was observed. Do not open energized equipment or bypass protective functions to gather information.
Response routing
Commercial questions are routed to sourcing support; load and configuration questions go to an application review; operating incidents follow the applicable service agreement. Clear routing reduces repeated explanations and keeps safety-critical details with qualified personnel.
A concise brief gets a precise response
List voltage, phase, present kW/kVA, autonomy, redundancy, ambient temperature and target location. Identify uncertain values rather than estimating them silently.
Attachments can be referenced in the message; our team will provide a secure transfer path if project drawings are needed. Mark confidential drawings before transfer and remove passwords, personal identifiers or network credentials that are not necessary for the review.
A first response will normally identify missing inputs rather than make an immediate model recommendation. Useful follow-up items can include measured peak demand, downstream load groups, generator characteristics, bypass availability, room temperature range, altitude, delivery access, floor loading and the planned maintenance window. Final equipment ratings, SCCR, selective coordination and code compliance must be confirmed against project documents by the responsible engineer.